Combined Sewer Overflow Event Indicators |
|
Project Name
|
Owner
|
Engineer
|
Contract Value
|
Contract Awarded
|
State
|
|
Combined Sewer Overflow Event Indicators
|
District of Columbia Water & Sewer Authority
|
Black & Veatch
|
$860,000
|
2008
|
DC
|
This project includes the installation of controls, instrumentation and devices for the monitoring and indication of combined sewer overflow events. The fast-paced project involves the following:
- The work is to be performed in four (4) locations around the District of Columbia. Unique challenges from these locations include working in high-profile areas, active pedestrian areas, public roadway closures and coordination with the National Park Service
- Level indicators, flow meters and control panels shall be installed at two Diversion Structures
- Pole mounted indicator lights and control panels shall be installed at two locations
- Integration of PLC controls, data acquisition and communication links between all four locations.
The constraints on the project require that USC and the DC WASA jointly address the issues of a critical project to provide a timely delivery.
|