| Standby Power System Eastside WWTP |
This project involved construction of two (2) new buildings. The Project included:
USC provided value engineering savings to the Owner in excess of $100,000 on this Project.
|
| Standby Power System Eastside WWTP |
This project involved construction of two (2) new buildings. The Project included:
USC provided value engineering savings to the Owner in excess of $100,000 on this Project.
|
Designed & developed by Hafenbrack Marketing